To be considered by the Works and Equipment Committee on September 27th, 1960. It was agreed that, when authorised, the diesel multiple unit service should be introduced in June, 1961.
Noted that it had not been possible for these units to be maintained at Annesley and they would require to be dealt with at Nottingham, London Road Low Level when this depot was complete. In the meantime, the A.C.V. units to be transferred from Willesden to Bulwell preparatory to their use as staff trains.
Traffic receipts for May and June, 1960 in respect of schemes with less that 12 months' operation by diesel multiple units attached as Appendix "A".