-3-
Noted that a satisfactory procedure had been agreed between the Commission and the manufacturers in respect of 100 single engine vehicles to be built by Messrs.Cravens for the L.M.Region.
Mr.Low stated that the prototype Rolls Royce unit was to be returned to Derby Works to be fitted with a special control system in order to prove the system is workable.
Mr.Low said the recommendation made at the meeting on July 16th were being considered by the Chief Mechanical & Electrical Engineer to see what could be done to improve availability.
Service in steam timings commenced on August 11th and augmented service in diesel timings on September 15th. Mr.Dow was of the opinion that the augmented service should be given a fair trial and he was not prepared to recommend that the figure of £2,500 per annum for anticipated additional receipts be increased. Mr.Dow would supply Mr.Nicholls with information in respect of through traffic which was not reflected in local to line bookings.
Diesel Lightweight
Trains Committee
Meeting 58
23rd September 1958
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Appendix A Page 1
Appendix A Page 2
Appendix B