528.  SCHEMES AUTHORISED BUT NOT YET IN OPERATION)

1.  Manchester Part 1 Scheme

As the result of the temporary loan of 11 2-car sets from the Eastern Region and 8 2-car sets from the N.E.Region, it was possible to introduce further diesel services into this scheme as from 17th June -

Manchester (London Road) -       )
  Macclesfield, Hayfield, Guide  )  E.O.A.
  Bridge, Stalybridge            )
Manchester (London Road - Crewe)

2.  Harrow - Belmont Scheme

Noted that 3-car unit is now undergoing tests as the makers' works.

3.  Derby, Nottingham, Leicester Part 1 Scheme

Scheme has been approved by B.T.C. and recommendation in respect of maintenance and fuelling facilities now awaited (see Minute 527.2)

529.  SCHEMES UNDER CONSIDERATION BY COMMITTEE BUT NOT YET SUBMITTED TO B.T.C.

1.  Wrexham, Chester, Bidston and Seacombe

Preliminary report already considered. Scheme now being re-examined as to possibility of service into New Brighton.

2.  Liverpool Central - Gateacre and Warrington (C)

Report now complete expect in respect of maintenance and fuelling facilities.  (See minute 527.2)

3.  Liverpool Lime Street - St.Helens Wigan

Preliminary report already considered.  Noted that this scheme is to be re-costed having regard to the decision that 2-car units with one 238 H.P. Rolls Royce engine under each 57' vehicle will be suitable for schemes on the Central Division.

4.  Birmingham Part 2.

Mr.Gould reported that this scheme is progressing satisfactorily and it is shortly expected to be passed to the Commercial side for their approval.

5.  Manchester Part 2; South East Lancs.

Preliminary report already considered. To be re-costed having regard to the decision that 2-car units with one 238 H.P. Rolls Royce engine under each 57' vehicle will be suitable for schemes in the Central Division.