close

Sign In


Not registered?
Forgot Your Password?

DMU Operations: North Eastern Region


Scarborough - Whitby - Middlesbrough

Scarborough - Whitby - Middlesbrough route diagram

A 58½ mile journey, the Scarborough - Whitby section closing on 8 March 1965, leaving a Middlesbrough - Whitby service.

Sample Timetables

9th June to 14th September 1958

Cover of North Eastern Region June 1958 timetable

In the Passenger Services North Eastern Region timetable it was included in Table 40 (1.2 mb pdf).

15th September 1958 to 14th June 1959

Cover of North Eastern Region September 1958 timetable

In the Passenger Services North Eastern Region timetable it was Table 40 (0.5 mb pdf).

15th June to 13th September 1959

Cover of North Eastern Region June 1959 timetable

In the Passenger Services North Eastern Region timetable it was Table 37 (1.1 mb pdf).

2nd November 1959 to 12th June 1960

Cover of North Eastern Region November 1959 timetable

In the Passenger Services North Eastern Region timetable it was Table 37 (0.6 mb pdf).

13th June to 11th September 1960

Cover of North Eastern Region June 1960 timetable

In the Passenger Services North Eastern Region timetable it was Table 37 (1.0 mb pdf).

12th September 1960 to 11th June 1961

Cover of North Eastern Region September 1960 timetable

In the Passenger Services North Eastern Region timetable it was Table 37 (0.6 mb pdf).

12th June to 10th September 1961

Cover of North Eastern Region June 1961 timetable

In the Passenger Services North Eastern Region timetable it was Table 37 (1.0 mb pdf).

18th June to 9th September 1962

Cover of North Eastern Region June 1962 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (1.1 mb pdf).

10th September 1962 to 16th June 1963

Cover of North Eastern Region September 1962 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (0.6 mb pdf).

17th June to 8th September 1963

Cover of North Eastern Region June 1963 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (1.1 mb pdf).

9th September 1963 to 14th June 1964

Cover of North Eastern Region September 1963 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (0.6 mb pdf).

15th June to 6th September 1964

Cover of North Eastern Region June 1964 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (0.7 mb pdf).

7th September 1964 to 13th June 1965

Cover of North Eastern Region September 1964 timetable

In the Passenger Services North Eastern Region timetable it was Table 34 (0.4 mb pdf).

Images

Class 101 DMU at Larpool Viaduct, Whitby

July 1958

Two Met-Camm triples (the leading vehicle looks like it could be E50747) comes off Larpool Viaduct at Whitby with a service for Scarborough in late July 1958. Michael Mensing.

Class 101 DMU at Whitby

22nd July 1958

E50264 leads a three-car Met-Camm away from Whitby with a Scarborough service on July 22nd, 1958. Michael Mensing.

Class 101 DMU at Hayburn Wyke

24th July 1958

A three-car Met-Camm DMU near Hayburn Wyke on 24 July 1958. Note one power car has the lion over wheel crest, the other a coaching roundel, suggesting a non-original formation - the DMCL will be from a four-car set. Michael Mensing.

Class 101 DMU at Ravenscar

Unknown date

A Met-Camm at Ravenscar on the Whitby-Scarborough line. John Darwent Collection.

Class 101 DMU at Battersby

4th August 1963

A six-car Met-Camm formation heads out of Battersby for Scarborough on August 4, 1963. Walter Burt.